| SAP PP - Production Planning and Control Goodies Stuff
This site has move to http://www.erpgreat.com/sap-pp.htm
Practical and helpful SAP PP Stuff to assist those supporting the SAP
Production Planning Modules.
SAP Certification Exam
Requirements for R/3 Consultants in Production and Production Planning
Sample Question in Production and Production Planning
MRP
Factory Calendar
Transaction Codes for MRP
Planning separately via Storage Location or Vendor with MRP Area
Rescheduling date does not take into account the GR Processing Time
Define Safety Stock Availability
MRP Group and MRP Controller
Scheduling Background Jobs for MRP
The Common Planning Strategy used
Production Order
Production order confirmation with future date is not allowed
Planned Order
Assign Multiple Planned Order to a Purchase Requistion
Goods Movement
Define the default components reservation movement type
Message
Production Control System Messages
Capacity Planning
Capacity Leveling Profile Setup
Engineering Change Management
A basic Engineering Change Management Setup
BOM
Creating a simple BOM
Explode BOM
Where used list for BOM
Controlling data for your Bill of Materials
Allocating BOM to Other Plant
Mass Change Bill of Materials
Multi-level configuration with variants
Standard Reports
Checking Costs and Revenues from the Sales Order
ABAP Reports
Exact data from the MRP Table
Production Order Quantity Change Daily Checklist
Best regards,
SAP ABAP Programming and Other IMG Stuff
http://sapabap0.tripod.com |